xnxx xnxxx xnxx xnxx

Leon has better road connection

HomeThe StateBusiness

Leon has better road connection

More than 229 million pesos are invested in public works delivered and supervised by the Governor With these works, the State Government guarantee

WOMENTEFACTURA 3.0 is held in Celaya
UVEG and UPB join forces and sign alliance
Marca GTO outlets are consolidated

More than 229 million pesos are invested in public works delivered and supervised by the Governor

With these works, the State Government guarantees better roads in the city and improves the quality of life of Leoneses

Da click en el link al final de la nota para leer en español:

This image has an empty alt attribute; its file name is Llamada-MasGto-OK-small-5.jpg

Leon/Gto News

Governor of Guanajuato, Diego Sinhue Rodriguez Vallejo, supervised and delivered infrastructure works that improve the quality of life of Leoneses; the investment of the State and the Municipality is for more than 229 million pesos.

Clases master

“With these works, we are taking a big step to consolidate the infrastructure of our roads that benefit not only people who have cars, because public transportation circulates here, and thousands of families who commute to their jobs and schools,” said the Governor.

Leon Roads Connectivity Guanajuato 3

Rodriguez Vallejo launched the construction of the vehicular bridge at the junction of the Talabarteros de Aurora and Jose Maria Morelos boulevards, a work that is closely watched by the Secretary of Infrastructure, Connectivity and Mobility and it will complete the Bicentennial Highway.

The State Government allocates an investment of 114.9 million pesos in this 480-meter-long bridge, which directly benefits more than 368,000 inhabitants and more than 46,000 vehicles that daily go through the area.

Leon Roads Connectivity Guanajuato 4

In this state administration, the Tellez Cruces and Hilario Medina bridges have been constructed, therefore, with the Talabarteros bridge, continuity is given to the modernization of this road of more than 18 kilometers in length.

The Governor and Alejandra Gutierrez, Mayor of Leon, delivered the rehabilitation of the 5 de Mayo Bridge, and supervised the first stage of the expansion of the Malecon del Rio.

Leon Roads Connectivity Guanajuato 5

This vehicular bridge presented damage to a component of its structure caused by vehicle impacts, and one of its girders was in poor condition, this made intervention necessary for the safety of motorists.

The investment in the bridge was for 7 million pesos by the Municipality, plus 62.5 million pesos invested in the works of the first stage of expansion of the Malecon del Rio.

“These are works that directly benefit the dynamics of the city, savings will be generated in travel times. The transfers will be more agile for more than 75 thousand drivers who circulate in this area”, explained the Governor.

The Governor also handed over the construction works for the first stage of the Siglo XXI boulevard at its intersection with the San Nicolas boulevard, this work consists of the construction of two vehicular bridges over the Tajo de Santa Ana.

With this work, almost 12,000 inhabitants of neighborhoods and subdivisions near the Tajo de Santa Ana will be able to cross the stream safely, and circulation conditions for more than 33,000 vehicles that circulate daily through this point have been improved.

The first stage of this work had an investment of 45.5 million pesos, it includes a length of 650 meters of road from the Siglo XXI boulevard and the San Nicolás boulevard it is expected to be completed this month.

En Español:

https://masgto.com.mx/2023/01/19/avanza-conexion-vial-en-leon/
TRADUCCION USMCA 2